CIPR
Written by RAZMAN BIN ABDULLAH
Conference Room, HCM HQ. On Wednesday: March 31, 2010, En. Mohamed Napi Yunus conducted a K Sharing Session on CIPR. By way of introduction, En. Napi works for Malaysian Recycling Company abbreviated as MARECO within the HCM Group of Companies. He has tremendous amount of experience in Road Design, Engineering and Construction, as such CIPR is very much his area of expertise. He is also the Knowledge Advsior for the Community of Recycling Technology (CORT) Community of Practice (COP) who was gracious enough the spend time with us to impart knowledge.
CIPR is one of the many solutions which our company employs in road repair works. It is an environmentally friendly and cost effective alternative to partial or total reconstruction of cracked pavements. Historically, the first CIPR job that was undertaken in our country was a road length of 8km between Temerloh and Mentakab, Pahang of which it was a joint venture effort between both University Malaya and Jabatan Kerja Raya.
CIPR is a good solution in treating major distress roads such as severe crocodile cracks, rutting or deformation, and pumping. The advantages to CIPR are the following:• Faster and more efficient as minimal excavation and dump trucks required
• Reuse of existing materials, and reduces new construction materials and transport cost
• The technique can give equivalent pavement structure condition and cost saving compared to conventional method
• Increases the shear strength and reduces the moisture susceptibility of granular materials
• Flexible and fatigue resistant (Foamed Bitumen and Emulsion)
• Cost Savings with approximately 10% – 30 %Some of the ingredients which makes up a typical CIPR solution would require Premix, Foam, Cement, and Crusher Run Furthermore a typical costing of any CIPR project works in the areas of Machinery, Manpower, and Material would entail the following :
Machinery :
Recycling Machine, Water Tanker, Vib Roller, 3 Tonne Lorry, Van / 1 Tonne Lorry, Back Hoe, Back Pusher/Power Broom, Paver Seat, T.Coat and P.Coat Spray, and Motorgrader.
Manpower :
Project Manager, Site Engineer, Site Supervisor, Scissorman, General Workers (Premix), General Worker (Cement) and Accommodation (Traffic)Material/Other Cost :
Cement, Premix ACBC, ACWC, Diesel, Prim Coat, Tack Coat and ToolsThis K Sharing Session was attended by HCME, Roadcare, and KPS HCM business units which cuts across departments such as MARECO, QA Contracts, MIS, SFU, and Engineering. It was indeed a remarkable session in which knowledge transfer was accelerated between several business units in a single room, in a mater of 2 hours.
We hope that this type of K Sharing Session amongst the many K Solutions which the other 17 Community of Practice (COP) have committed in their 2010 Calendar Plan will enable HCM Group of Companies to reach the Knowledge Based Organisation in 2011 (KBO 2011) target as envisaged by our MD/CKO , YBhg Dato’Ir Hasnur Rabian Ismail.
Please be free to visit our CORT’s blog http://blog.hcme.com.my/operationsNote : Please use the following link for ;1. Pictures :http://km.hcme.com.my/index.php?option=com_expose&Itemid=195http://km.hcme.com.my/index.php?option=com_expose&Itemid=195
2. News : http://km.hcme.com.my/index.php?option=com_content&task=view&id=882&Itemid=1
3. Powerpoint Presentation Slides -
TPG – 31/1/2010 to 17/2/2010




-
Compentency Overseas COP
This is list of the competencies in this Overseas COP
1. Premix Lab Testing (Marshall test, Preparation marshall specimen, Extractior of butimen, Binder content & Grading test, Calculation of marshall properties)
2. CIPR Lab Testing (Preparation of sample, grading, UCS, ITS)
3. Concrete Lab testing (Preparation of cube, cube test, slump test, CF test, Rebounce hammer test)
4. Soil Lab Testing (Moisture content, Proctor test, Atterberg limit, CBR, Specefic grafity, Sieve analysis)
5. Material testings (ACV, PSV, AIV, CBR, Proctor)
6. Field Sampling & Testing (Sampling of aggregate, Test pit, Sampling CIPR, Sampling JIPR, Insitu CBR, FDT-sand replacement, FDT-core cutter)
7. Client Specification
8. Project Quality Plan
9. Plant trial (Checking the calibration status of the plant equipments, check combine grading & mix design, Check temperature, Sampling of material, Premix lab testing)
10. Mix Design (Combine grading, Lab trial mix, Preparation marshall specimen, ITS, Calculation of marshall properties)
11. Trial Lay
12. Foreign Language (Arabic)
-
Swani Site


-
Jandubah Site


-
Picture at Hira Site


-
Welcome to Overseas Blog
Assalamualaikum dan selamat sejahtera…
List name for Overseas Communities of Practice (COP)
1
Ir. Jamal Dato’ Nasir General Manager 2
Mohd Nasir Hassan General Manager( Overseas Unit) 3
Raja Abdul Wafi Raja Abdullah Project Engineer 4
Asri Ramli Project Engineer 5
Alias Barin Supervisor 6
Ruzaidi Mat Mechanical Executive 7
Irwan Shamsuddin Yatim Mustafa Planning Engineer 8
Nordin Manshor Sr. Machine Operator 9
Muhamad Anuar Abdul Hamid Sr. Machine Operator 10
Ahmad Azdha Ahmad Mukhtar Sr. Machine Operator 11
Wan Mohd Zaher Wan Jaafar Sr. Machine Operator 12
Mohd Asri Ismail Sr. Machine Operator 13
Iskandar Othman Sr. Machine Operator 14
Elias Mohammad Senior Account Exe. 15
Juhari Jobok Surveyor 16
Ismail Ibrahim Admin Executive 17
Maizatul Akmal Ab Rahman Accounts Exe. 22
Sivaraj a/l Maniam Site Supervisor 18
Mukesh A/L Rasu Operator 19
Zulkifli Omar Operator 20
Mohamad Zubir Mohd Noor Operator 21
Anbalagan a/l Venban Operator Plant 23
Osman Abu Bakar QS 24
Siti Farhana Bt Ngah Dimin QS 25
Mohamed Azlan Sareh QS 26
Idzmazureena Ismail QS
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| « Jun | ||||||
| 1 | 2 | 3 | 4 | 5 | ||
| 6 | 7 | 8 | 9 | 10 | 11 | 12 |
| 13 | 14 | 15 | 16 | 17 | 18 | 19 |
| 20 | 21 | 22 | 23 | 24 | 25 | 26 |
| 27 | 28 | 29 | ||||